Project: City of La Verne – Athletic Field – Glen Davis Stadium
Services Provided: Construction Management Services
RMA Project Mgr: Raymond Rodriguez
Completion Date: Fall 2007
Project Description:
This project was a joint effort between the City of La Verne and the Bonita Unified School District and was for the replacement of the football field at the Glenn Davis Stadium. The existing field was a natural grass and had suffered from years of over use, and had long since reached its useable lifecycle. We worked with the city engineer to coordinate the construction effort between the contractors, the city maintenance department, the School districts maintenance department and the local school to ensure that all their needs were met. The project consisted of the removal of the existing field and irrigation systems, Removal of some 500 yards of dirt and debris, Installation of a new drainage system, new synthetic turf system and the replacement of various electrical systems which powered the lights, scoreboards, PA systems and on field power systems. This project was delivered on time and on budget.

|
RMA has developed a comprehensive approach to the inspection and assessment
of a variety of facilities. We can provide you with reliable reports on the
current state of your facilities along with information showing necessary
repairs needed with in the next 5 and 10 years. We also provide estimates of
those repairs and can identify important critical or environmentally
sensitive areas that may need to be addressed sooner.
Read more... |
|